Prep for side supports:
Shave support poles
1. This has been changed to wrap and varnish cord stops.
2. Cut poles to length
Drill support poles for shims
These should be done as slots with a metal shim used for locking
Cut 1x6 with locking ends
Need to determine length.
Drill locking ends for shims.
These should be done as slots with a metal shim used for locking
Forge 8 locking shims
Forge nails for holding 2nd layer of inside supports
Cut and work top bar.
1. Cut to length
2. Drill 4 holes for stops
3. Round ends
Side supports setup:
Drill top hole for iron pole
1. 1 inch for iron bar
2. Down 1 foot from top for decoration
Determine height of table and drill holes for poles.
Cut and nail 2nd layer on inside supports
Cut holes for bottom supports
Cut slots for side bars
Assemble, mark and cut bottoms
Finishing parts:
Forge 4 cross bars for stability and hooks for hanging
Drill crossbars for hooks and bolts
Rivet hooks on crossbars
Cut planks for storage table
Glue and nail cross bars/locking bars
Hanging grate:
Cut angle iron to grill size
Forge corners/hanging bar
Accessories:
Lid lifter
Coal Shovel
Broom
Wisk broom
Ladle
Coal Tongs
Coal Rake
Trivits
Hanging Spit
“S” hooks
One additional note from this week, I finished the bottle I was making for Mors: